
Add to Cart
Custom CNC Machining Aluminum Laser Cutting Anodized Parts Manufacture For Bike
Quick details:
1. Keyword: CNC Laser Cutting Parts
2. Process: CNC Machining
3. Color: Black
4. Place of Origin: Guangdong, China
5. Application: Bicycle Accessories
6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
7. Equipment: CNC Machining Centers
8. Lead time: 1-2 weeks
Manufacture Equipment list:
1. CNC milling machine
2. CNC turning lathe machine
3. Laser cutting machine
4. Bending machine
5. Punching machine
6. Chamfer machine
7. EDM machine
8. WEDM machine
9. Grinding machine
10. Injection machine
11. Die casting machine
12. Polishing machine
13. Drilling machine
14. Waterproof test machine
15. Pulling tension tester machine
16. Hardness testing machine
17. CMM measurement machine
18. CNC Turning Brass Parts, steel, aluminum,
Sheet Metal Laser Cutting Parameters:
Materials | Metal: Titanium, Aluminum, Stainless steel & Steel, Brass |
Plastic: POM, PEEK, ABS, Nylon, PVC, Acrylic, etc. | |
Processing | CNC turning, CNC milling, CNC turn-milled, Laser cutting |
Surface Treatment | Powder Coated, (Ordinary & Hard) Anodized, Electro polished & Polished, Plating, Bead Blasted, Heat treatment, Passivate, Black oxidate, Brushing, Laser engraving |
Tolerance | +/-0.005mm |
Lead Time | 1-2 weeks for samples, 3-4 weeks for mass production |
Quality Assurance | ISO9001: 2015, SGS, RoHS, TUV |
Drawing Accepted | Solid Works, Pro/Engineer, Auto CAD(DXF, DWG), PDF |
Payment Terms | Trade Assurance, TT, PayPal, WestUnion |
FAQ:
Q1: How do I get a quote?
A1: Please give us detailed drawings (PDF/STEP/IGS/DWG...), including material, quantity, and surface treatment information.
Q2: Can I get a quote without drawings?
A2: We would, of course, appreciate receiving your samples, pictures, or drafts with detailed measurements for accurate quotation.
Q3: Will my drawings be leaked if you benefit?
A3: No, we take great care to protect the privacy of our client's drawings and can sign a confidentiality agreement if necessary.
Q4: Can you provide samples before mass production?
A4: Of course, a sample fee is required, and if possible, refundable for mass production.
Q5: What about the lead time?
A5: Generally, it takes 1-2 weeks for samples and 3-4 weeks for mass production.
Q6: Can I know the condition of my products without going to your company?
A6: Yes. We will provide detailed production plans and send weekly reports with digital pictures and videos to show the production process.